Maddington Truck Centre - Timatanga
West Coast Group completed a comprehensive commercial plumbing installation at the Maddington Truck Centre, engineered to handle heavy-duty industrial demands.
Our team managed the end-to-end execution of specialized waste systems, ensuring the facility meets strict environmental and operational standards. A key feature of the project was the integration of a high-capacity Aerobic Treatment Unit (ATU) to efficiently process complex commercial wastewater. Additionally, we installed a specialized oil separator system specifically designed for the heavy-vehicle washdown bay to safely capture and treat runoff. By delivering robust, compliant infrastructure under demanding requirements, WCG has ensured the Maddington facility is fully equipped for long-term, high-volume operations.